Wednesday, June 6, 1962 – Food Contract, Boilerplate Purchase


The Manned Spacecraft Center has awarded to the Whirlpool Corporation Research Laboratories of Saint Joseph, Michigan, a contract to provide the food and waste management systems for Project Gemini. Whirlpool is to provide the water dispenser, food storage, and waste storage devices. The food and the zero-gravity feeding devices, however, are to be provided by the United States Army Quartermaster Corps Food and Container Institute, of Chicago. The Life Systems Division of the Manned Spacecraft Center is responsible for directing the program.
Continue reading “Wednesday, June 6, 1962 – Food Contract, Boilerplate Purchase”

Friday, May 11, 1962 – Survival kit, biological measurements, spacewalk requirements


A two-day meeting on Gemini crew support systems has identified seven parameters to be measured for determining crew conditions during the Gemini flights. The instruments needed for the highest priority items — blood pressure, electrocardiogram, phonocardiogram, electroencephalogram, respiration, galvanic skin response, and body temperature — would require about three and a half pounds per pilot, require two watt-hours of power, and demand the shared use of six telemetry channels. Approved for development, then, are measurements of the electrocardiogram, respiration rate and depth, oral temperature, blood pressure, phonocardiogram, and nuclear radiation dose.
Continue reading “Friday, May 11, 1962 – Survival kit, biological measurements, spacewalk requirements”