Saturday, April 7, 1962


McDonnell has awarded a $1 million subcontract to the ACF Electronics Division of ACF Industries (Riverdale, California). The subcontract is to provide C-band and S-band radar beacons for the Gemini craft. The beacons are to be part of the tracking system for the spacecraft.

The C-band radar would transmit at 5765 MHz and receive at 5690. The S-band radar would transmit at 2910 MHz and receive at 2840.

Author: Project Gemini Chronology

The Project Gemini Chronology is drawn from multiple sources, but most heavily from NASA's Special Publication-4002, Project Gemini Technology and Operations: A Chronology, prepared by James M Grimwood and Barton C Hacker, with Peter J Vorzimmer. Other chronologies will be used where fitting, such as (particularly) those for Project Mercury and Project Apollo.

Please Write Something Good

This site uses Akismet to reduce spam. Learn how your comment data is processed.